Highway 40
This project scope of work included the widening of the road’s eastern section between Goral and Ohalim Junction (18 Km.) two lanes in each direction. Earthworks were executed for three lanes in each direction.
The project included the expansion the road in both directions, two lanes each, at the west part from Goral junction to Ohalim junction (about 18 km). Earthworks were carried out for three lanes in each direction. Construction of two interchanges: Hativat HaNegev and Sarah interchange. The length of Hativat HaNegev bridge is approximately 65 m. The length of Sarah bridge is approximately 63 m. The length of Nahal Beka bridge is approximately 53 m.