Akko – Carmiel Railway – Section 2
This is the second section of four-sectioned Akko-Carmiel railway. Project scope: Construction of the new Route 85 section + renovation of the existing part of the road between the Ahihud junction and the entrance to Bar-Lev industrial area.
This is the second section of four-sectioned Akko-Carmiel railway. Project scope: Construction of the new Route 85 section + renovation of the existing part of the road between the Ahihud junction and the entrance to Bar-Lev industrial area. Total Length – 2.6 km, of which 900 meters are new. Construction of culverts and two bridges. Various types of retaining walls and embankment of about 500,000 cubic meters.