Motza Bridge
The road will be widened to three lanes in each direction including lane dividers, standard hard shoulders and safety barriers.
The road will be widened to three lanes in each direction, including traffic separators, shoulders and safety barriers. The work includes several basic elements:
Motza bridges, about 800 meters long each, earth filling and road laying in Wadi Arza, construction of ramps, retaining walls, pathways to the bridge abutments and preparations for high-voltage electricity lines.