Savidor Train Station
Upgrading Savidor Train Station – north entrance. Conventional method foundation. Execution of the buildings includes all system work inside the buildings, connecting the buildings to the train station’s main systems, assembling escalators and elevators, and including opening a pedestrian passage in the northern part of the station.